HAF Wind
Energy Project |
The
HAF Wind Energy Project is located in
the township of West Lincoln in the Niagara Region
of south‐western Ontario. The project is located
south of the community of Tweedside, west of the
community of West Lincoln and east of the community
of Woodburn. The environmental studies were
conducted over an area of 4800 hectares and all
the project components are located on privately‐owned
agricultural lots within the study area. The topography
of the area is open flat land with an elevation
of 190m to 197m. The energy collection system
runs underground along the newly constructed access
roads as well as public road right of ways. All
wind turbines are located on open agricultural
fields and respect all setbacks from residences,
natural heritage, water and other features as required
under the REA. |
|
|
|
|
Quick
Facts |
Project
Size |
9MW |
Wind
Turbines
|
5 Vestas
V100-1.8MW
|
Hub
Height |
95m |
Rotor
Diameter |
100m |
Estimated
Power Generation |
26
million KWh per year |
Estimated
Homes powered
by this project |
2500 |
Estimated
Green house
gas reduction per year |
14000
tons |
Status
of REA |
Renewable Energy Approval Recieved |
|
|